With the exception of the kitchen – still have a problem with the installation of the dishwasher but hopefully that will be fixed soon! Plus, the logs are installed but the – I’m not sure what you call it – deflector, maybe? – still has to be put in so that the mantel doesn’t get so hot. All in all, though, I am almost there. Now to move the rest of my stuff in! Since I am almost all done (deadline Christmas, which means the second week of January), I tried to take some pictures to compare to the original pictures and here they are:
Front of the house – no need to repost the “old” picture since it is the masthead…:
Side of the front of the house:
Bathroom – after extending it about 3 feet because it was beyond claustrophobic before:
The living room – there are a couple of angles here and the Christmas tree did force me to move around what is normally in the “picture window” but hey, it’s Christmas! I made a couple of comments about getting a 3 or 4 foot tree and my sister-in-law went crazy about my not-even-here-yet Charlie Brown Christmas tree so I just got a big one. 🙂
Ack – wrong angle!
Fireplace:
Kitchen:
Removing the wall between the dining room and kitchen really opened everything up!
The den/office:
All of the saloon doors are gone!
That chair will be painted and have a seat eventually…